St. Timothy’s Church Trusses Begins

Friday, May 10th, 2013

George Weis 贵州11选五网 was awarded the new St. Timothy church in Creve Coeur, MO addition by the general contractor Don C. Musick Construction 贵州11选五网 to install the steel roof trusses, load bearing steel stud walls, interior steel stud framing, drywall, taping, EIFS (Dryvit), and the acoustical ceilings (drop ceilings) on the project.

Inclement weather has delayed the project however the walls are built and trusses are being set. The end date has not changed despite the weather delays so the project schedule is fast pace.

Being one of the oldest reputable union St. Louis area plastering contractors in the area we specialize in all types of plastering whether it be EIFS on a church or brand new 120,000 SF veneer plaster schools, new stucco, EIFS (dryvit) patching, EIFS repair, stucco repair, wood lath and plaster, residential plaster repair, or any other type of plaster repair or new work.